ApeSurvey Key Features
Precise Positioning of Road Centerlines and Edges: Ensures that road construction adheres to design specifications.
Graphical display of calculation results, providing clear and intuitive visualization. Connects to instruments for real-time coordinate data acquisition, avoiding manual input errors. Supports multiple brands of total stations and GNSS receivers.
ccurately plan and construct road slopes in complex terrain, enhancing construction efficiency and safety. Supports flexible definition of abrupt and gradual transitions for cut and fill slopes.
Graphically displays the positional relationship between measured points and the slope. Real-time calculation and display of staking guidance values.
Quickly measure and record the cross-sections of roadbed, facilitating subsequent analysis and design adjustments. Suitable for measuring cross-sections at any mileage of roadbeds, river channels, or other linear projects. Automatically draws and exports as CAD drawings.
Supports real-time data collection and processing.
Accurately calculate the positions of key structural points for bridge piers and caps to ensure precise bridge construction. Utilizes pier and cap templates along with their positions on the alignment for calculations.
Supports staking for complex bridge structures. Provides an intuitive graphical interface.
User Case
Practical Application of ApeSurvey Software
Sichuan-Tibet Highway Complex Terrain Survey
Challenge: The Sichuan-Tibet Highway project faced complex mountainous terrain. Traditional surveying methods were time-consuming, less accurate, and posed high safety risks.
Solution: The project team adopted the slope staking and cross-section measurement features of the ApeSurvey Software.
Outcome: Surveying efficiency increased by 200%, significantly shortening the project timeline. Measurement accuracy improved to centimeter-level, ensuring the precision of the road alignment. The exposure time of personnel in hazardous terrain was reduced by 70%, enhancing safety, and approximately 30% of project costs were saved.
Project Leader’s Feedback: “The use of ApeSurvey Software has completely transformed our workflow. It not only increased our efficiency but also significantly boosted our ability to survey in complex terrain.”
Beijing-Shanghai High-Speed Railway Extension Bridge Project
Challenge: The project involved the construction of multiple large bridges, requiring high-precision measurements to ensure the accurate positioning of bridge piers.
Solution: The bridge staking feature of the ApeSurvey Software was employed, combined with GNSS technology.
Outcome: Pier positioning accuracy reached millimeter-level, far exceeding traditional methods. Staking efficiency increased by 150%, accelerating construction progress. Repeated measurement tasks were reduced by 80%. The data visualization feature helped identify and correct three potential construction deviations in a timely manner.
Project Leader’s Feedback:“The bridge staking feature of ApeSurvey Software is incredibly powerful. It not only boosted our work efficiency but also significantly enhanced our measurement accuracy, which is critical for ensuring the quality of large-scale bridge projects.”
Urban Expressway Network Reconstruction Project
Challenge: Conducting large-scale road reconstruction in a busy urban environment required fast and accurate measurements to minimize the impact on traffic.
Solution: The road staking and real-time data processing features of ApeSurvey Software were utilized.
Outcome: Measurement time was reduced by 60%, significantly minimizing traffic disruption. Real-time data processing cut the response time for design changes by 80%. Measurement data accuracy improved by 90%, reducing rework. Overall project duration was shortened by 20%.
Municipal Engineering Supervisor's Feedback: "ApeSurvey Software has greatly simplified our workflow. Its real-time data processing capability allows us to quickly address various on-site challenges, which is especially crucial in complex urban environments."